Engineering Support for Cement Plant Electrical Systems
Selection should start from site data: harmonic spectrum at the PCC and drive terminals, the kVA/kW/kVAR profile across the production cycle, recorded sag events, existing capacitor bank configuration, and transformer oil volume and tank dimensions for NIFPS. CTR’s Energy Audit and Power Quality Analysis service provides this data and results in a technical report with a recommended equipment schedule.
To discuss your plant’s power quality or transformer protection requirement, contact CTR’s technical team with your single-line diagram, drive list and recent measurement data.